-
-
Contact Us
-
Language
Blog
—
How to correctly start the double linkage electro-hydraulic servo CNC bending machine
2021-01-26

The double linkage electro-hydraulic servo CNC bending machine shall be operated by special personnel, and non-relevant personnel are prohibited from operating on the machine.
The operator shall wear labor protection articles before operating the double linkage electro-hydraulic servo numerical control bending machine, and carefully check the double linkage electro-hydraulic servo numerical control bending machine and its working environment, and start the operation after checking and confirming. The contents of the inspection include the equipment performance of the double linkage electro-hydraulic servo numerical control bending machine, the setting of the program and the mold, the maintenance of the machine and the shift change record. If any abnormality is found, it shall be reported to the foreman in time.
Double linkage electro-hydraulic servo CNC bending machine correct boot steps:
- Start the total power supply of the double linkage electro-hydraulic servo CNC bending machine;ncControllcdThe panel opens automatically; start the hydraulic motor; after zeroing, enter the main catalog state.
- Press the start switch of the control panel to reset the double linkage electro-hydraulic servo numerical control bending machine to zero; start the control switch, enter the zero page, and step on the left foot switch first.yReturn the axis to zero, and then step on the foot switch to return the other axes to zero.
- Self-compiledNCDuring the program, the upper and lower dies are selected according to the length and thickness of the workpiece and the bending pressure gauge. During the bending process of the machine, interference between the workpiece, the upper and lower dies and the stop gauge is avoided to ensure personal safety. The preparation of the program has a direct and angle..
- Read stored operation in run modeNCProgram and check, according to the requirements of the program into the specified upper and lower mold. When the mold is installed, the machine tool should be set in a stopped state.
5After the origin is set, enter the programming mode. When compiling the program by yourself, select the upper and lower dies according to the length, thickness and other attributes of the workpiece and the bending pressure gauge. The bending pressure of the machine should be less than the pressure resistance of the die. Clamp the upper and lower dies, and tighten the segmented dies one by one. Programming should be considered in the bending process, to avoid the workpiece, the upper and lower die and stop gauge interference, to ensure personal safety. There are two modes of programming, direct and angle, and the programming is completed.,At least two dry runs in run mode and check the accuracy of the procedure before bending work.
2021
/
01-26
Classification:
Industry Information
RELATED INFORMATION
Welcome to inquire
+86-714-6355458
Contact E-mail: sales@ysd-hd.com
Address: No. 158 Jinshan Avenue, Economic Development Zone, Huangshi City, Hubei Province
Copyright © Hubei Tri-Ring Metalforming Equipment Co.,Ltd
This website supports IPV4 / IPV6 bidirectional access