Construction project (Phase II) completion of environmental protection self-acceptance publicity announcement!

Construction project (Phase II) completion of environmental protection self-acceptance publicity announcement!

  • Categories:Latest news
  • Author:
  • Origin:
  • Time of issue:2017-12-12 16:42

Construction project (Phase II) completion of environmental protection self-acceptance publicity announcement!

(Summary description)On September 13-14, 2017, and September 19-20, 2017, Hubei Tri-ring Metal Forming Equipment Co., Ltd organized the environmental protection site acceptance inspection of the completion of the company's large-scale, precision CNC forging machine development base construction project (Phase II).

  • Categories:Latest news
  • Author:
  • Origin:
  • Time of issue:2017-12-12 16:42
  • Views:
Information

On September 13-14, 2017, and September 19-20, 2017, Hubei Tri-ring Metal Forming Equipment Co., Ltd organized the environmental protection site acceptance inspection of the completion of the company's large-scale, precision CNC forging machine development base construction project (Phase II). The acceptance inspection team is composed of environmental protection engineering construction unit (Gansu Beixin Environmental Protection Technology Co., Ltd.), environmental assessment unit (Huangshi Environmental Protection Research Institute), acceptance investigation and monitoring unit (Hubei Huatu Environmental Testing Technology Co., Ltd.) and 2 experts (list attached After) composition. The acceptance inspection team conducted on-site investigations on the construction and operation of the project and environmental protection facilities, listened to the construction unit's report on the implementation of the project and environmental protection, and the acceptance investigation and monitoring unit's report on the contents of the "Acceptance Investigation Report", and checked and verified the relevant data. After careful study and discussion, an inspection opinion was formed and rectification requirements were put forward. As of December 7th, the company has completed all the rectification content; after the company's self-examination, the project is considered to meet the environmental protection acceptance conditions. According to the "Construction Project Management Regulations" and the relevant requirements of the enterprise's own acceptance, the acceptance opinions of this project are now public :

1. The basic situation of the project

1. Basic information of construction project

Project Name: Hubei Tri-ring Metal Forming Equipment Co., Ltd Large-scale, precision CNC forging machine tool development base construction project (second phase).

Project construction unit: Hubei Tri-ring Metal Forming Equipment Co., Ltd

Nature of project construction: expansion

Project construction site: between A11-b and A13-c roads on the south side of Jinshan Avenue, Huangshan Mountain Industrial Park, Huangshi Economic Development Zone, on both sides of the first phase of the construction project.

2. Construction content of environmental assessment

(1) The total construction area of ​​newly built CNC machining workshop, small parts machining workshop, plate welding workshop, office auxiliary building, administrative building, power distribution room, air compressor room, etc. is 40879㎡.

(2) Add 77 sets (sets) of production, inspection and transportation equipment such as CNC floor boring and milling machining centers, horizontal machining centers, and CNC lathes;

(3) Supporting power supply, water supply and drainage and environmental protection facilities.

3. According to the site investigation, the actual construction content

(1) The total construction area of ​​CNC machining workshop, small-piece machining workshop, plate welding workshop, office auxiliary building, power distribution room, air compressor room, etc. is 31279㎡. An administrative building with an 8F building area of ​​9600m2 was not built.

(2) Add 77 sets (sets) of production, inspection and transportation equipment such as CNC floor boring and milling machining centers, horizontal machining centers, and CNC lathes;

(3) Supporting power supply, water supply and drainage and environmental protection facilities.

4. Total investment of the second phase project, environmental protection investment

The total investment of the second phase of the project is 337.95 million yuan, including 2.53 million yuan for environmental protection.

The actual total investment of the second-phase project is 131.27 million yuan, of which 3.2 million yuan is a special environmental protection investment, accounting for 2.44% of the total investment.

5. List of project construction

  Project Construction List

 

Serial number

project

EIA situation

Changes

  Construction Content   

1

Construction Content

The total construction area of ​​newly built CNC machining workshop, small parts machining workshop, plate welding workshop, office auxiliary building, administrative building, power distribution room, air compressor room, etc. is 40879㎡.

The total construction area of ​​CNC machining workshop, small parts machining workshop, plate welding workshop, office auxiliary building, power distribution room, air compressor room, etc. has been built up to 31279㎡. An administrative building with an 8F building area of ​​9600m2 was not built.

A 1F first joint workshop (CNC processing workshop + small parts processing workshop), a 1F plate welding workshop, two 3F office auxiliary buildings, power distribution room, air compressor room, etc. have been built

2

investment

The total investment is 337.95 million yuan, and the environmental protection investment is 2.53 million yuan.

The total investment is 131.27 million yuan and the environmental protection investment is 3.2 million yuan

/

3

Construction scale

1070 units/year

934 units/year

/

4

Consumption of main raw materials

Profile 413.8t/a, steel plate 8386.3t/a, welding wire 42.2t/a, paint 16.8t/a

The consumption of main raw materials is expected to be reduced relative to the EIA, the profile 362t/a, steel plate 6310t/a, welding wire 33.1t/a, paint 13.1t/a

/

5

Grinding and rust treatment measures

The closed-type shot blasting derusting machine should be used for the grinding and derusting process. The dust is collected and treated by the cyclone dust collector and the bag dust collector after purification

Due to the change in paint spraying process, the dust generated in the shot blasting process uses the LLT-30 filter cartridge dust collector in the QXY3000 steel plate pretreatment line to replace the explosion-proof anti-combustion dust removal ventilation system in the original process. The shot blasting dust is purified by the LLT-30 filter cartridge dust collector in the QXY3000 steel plate pretreatment line, and then discharged from a 15m high exhaust cylinder at high altitude.

A QXY3000 steel plate pretreatment line has been built, the equipment is equipped with LLT-30 type filter drum dust collector, and a 15m exhaust cylinder has been built.

6

Paint exhaust gas treatment facility

The paint mist generated in the paint spraying process is collected by the air collection hood and then treated with a water film dust collector for paint spraying process

The construction unit changed the pretreatment and painting of steel plates in the important process of the original process. The manual spraying in the original EIA report was changed to fully automatic sealing operation (QXY3000 steel plate pretreatment line), which reduced the discharge of pollutants in the production process. The paint removal method adopts "filter cartridge + activated carbon adsorption" method.

A QXY3000 steel plate pretreatment line has been built, the equipment is equipped with a "filter cartridge + activated carbon adsorption" purification system, and a 15m exhaust cylinder has been built

7

Wastewater treatment measures

The oily sewage in the production workshop is pretreated with oil, and the domestic sewage is pretreated with oil and slag and septic tanks. All sewage is discharged into the sewage network of the park.

The first phase of the project has completed the construction of a sewage treatment station for the entire plant, which is located in the northwest corner of the plant. The production wastewater and domestic sewage are treated by oil separation and then enter the first-stage sewage treatment station to reach the third-level standard and then discharged into the sewage pipe network of the park.

A grease trap has been built next to each workshop of this project

8

Emergency measures

The EIA requires the setting of an emergency pool with a volume of 120m3

During the construction of the third phase of the project, the collection tank and regulating tank will be temporarily used as temporary storage tanks for waste water during accident discharge.

/

2. Implementation of environmental protection measures

1. Exhaust gas

(1) Welding fumes

The EIA report stated that welding fumes were treated by installing a mobile welding fume purifier, and filtered clean air was directly discharged into the workshop.

According to the site survey: the construction unit has purchased a mobile welding fume purifier, so that welding fumes are treated by installing a mobile welding fume purifier, and the filtered clean air is directly discharged into the workshop room.

(2) Sanding and dust removal

The EIA report stated that shot blasting is a process that uses compressed air to spray steel shots or glass shots onto parts to remove scale and other contaminants. Shot peening is used for surface treatment before steel processing or painting: surface matting and descaling. This project Q6930 shot blasting is set in the plate welding workshop. A large amount of dust is generated during the shot blasting process. The equipment is equipped with an explosion-proof, anti-combustion and dust-removing ventilation system. The dust removal efficiency can reach 99.5%. The exhaust gas is discharged through a 15m high exhaust cylinder.

According to the description of the change in the EIA: the dust generated in the shot blasting process uses the LLT-30 type filter cartridge dust collector in the QXY3000 steel plate pretreatment line to replace the explosion-proof anti-combustion dust removal ventilation system in the original process. The changed dust removal process uses a filter cartridge dust collector. For the micro-barrel type dust collector, it has the advantages of small size, high efficiency and easy operation, and has been promoted in various industries in recent years. The filter cartridge type dust collector is mainly composed of an air inlet pipe, an exhaust pipe, a frame, a filter element, a back blowing system, an ash unloading system, and an electronic control device. The filter cartridge is composed of a top cover, a metal frame, a pleated filter material, and a base. The filter cartridge is folded with a designed length of filter material, and the head and tail are bonded into a tube. The inside and outside of the tube are supported by a metal frame, and the top and bottom are used for the top cover It is fixed with the base, and the top cover has fixing bolts and washers. In order to facilitate operation and maintenance, the filter cartridge is arranged at an angle. The dust collector has high dust removal efficiency, and the dust removal efficiency reaches 99.99%.

According to the site survey: the construction unit has completed the construction of the QXY3000 steel plate pretreatment line. After the shot blasting dust is purified by the LLT-30 filter cartridge dust collector in the QXY3000 steel plate pretreatment line, it is discharged from a 15m high exhaust tube at high altitude.

(3) Paint exhaust

The EIA report stated that the coating facilities of Sanhuan Forging Industrial Park were constructed once in the first phase of the project, located in the northeast of the heavy workshop of the first joint plant, with an area of ​​1584m2. The products of the second phase were sprayed in this area, and the paint was sprayed in the second phase of the project The process is intended to use manual electrostatic spraying, to be operated indoors and allowed to dry naturally.

Exhaust gas treatment: adopt two sets of RCL series pumpless water curtain paint mist purifier, paint mist treatment method: paint mist purifier is to use the negative pressure of the exhaust fan to directly atomize the water in the water tank into water droplets and raise and collect them to the overflow tank To form a weir flow water curtain. The water curtain falls down along the floodboard, and finally flows into the water tank in the form of a water curtain. Along with the above-mentioned water curtain circulation process, the paint spray mist is purified with three levels of increasing strength, and the purification efficiency is as high as 99.8%, which is stable and reliable. The exhaust gas is discharged through a 15-meter chimney after absorbing benzene pollutants through an activated carbon filter box.

Add 0.3-0.5% of special Ⅺ-Ⅴ special flocculant to the circulating water of RCL. This inorganic macromolecular flocculant can cause the paint mist particles to form a non-cohesive paint residue in water. Actual use only needs to periodically remove the precipitated paint residue from the water tank, and make up water and a small amount of Ⅺ-Ⅴ flocculant in a timely manner. RCL's circulating water does not need to be discharged at any time, and there is no worry about secondary sewage. The resulting paint slag and solvents are not easily regenerated, and they are entrusted for disposal as hazardous waste.

According to the description of the changes in the EIA: In order to save energy and reduce emissions, and to improve the economic benefits of the enterprise, the construction unit has changed the pretreatment and painting of steel plates in the important process of the original process. The manual spraying in the original EIA report was changed to a fully automatic sealing operation (QXY3000 steel plate pretreatment line), which reduced the discharge of pollutants in the production process.

QXY3000 steel plate pretreatment line is mainly used for steel plate, surface shot blasting, automatic painting and drying, that is, steel pretreatment. After the surface pretreatment of the steel, the scale and rust spots generated during the rolling and storage of the steel are completely removed, so that the surface has a certain roughness, the adhesion of the paint film is improved, and the paint maintenance cycle is extended. Steel surface pretreatment improves the material's fatigue resistance and improves its internal quality. Steel surface pretreatment improves the efficiency of CNC cutting, ensures the quality of the cut, and extends the life of the cutting tool. The use of steel pretreatment technology can free workers from the heavy cleaning and derusting work, improve working conditions, reduce labor intensity, and reduce environmental pollution.

QXY3000 steel plate pretreatment line is composed of lifting and traversing device, shot blasting machine, automatic paint spraying room, drying room, workpiece conveying system, paint mist filtering system, shot blasting dust removal system and electrical control system. QXY3000 steel plate pretreatment line adopts "filter cartridge + activated carbon adsorption" method for paint removal.

According to the site survey: the construction unit has completed the construction of the QXY3000 steel plate pretreatment line. After the paint exhaust gas is purified by the "filter cartridge + activated carbon adsorption" system in the QXY3000 steel plate pretreatment line, it is discharged from a 15m high exhaust pipe at high altitude.

(4) Oil fume purification device

The EIA report stated that the project has a canteen for two meals a day and uses natural gas as energy. The EIA recommends that the construction unit adopts the corresponding range hood purification system in the range hood system, the purification efficiency is greater than 85%, and the flue gas is led to the exhaust pipe 3m above the roof through the built-in flue.

According to the actual site investigation, the canteen was equipped with a range hood to treat the exhaust fumes and led it to the roof for discharge.

(5) List of exhaust gas treatment measures

  List of exhaust gas treatment measures

 

Serial number

Source of pollution

Pollution production

Main pollution factors

EIA requirements

Actual measures

1

The first joint plant

Machining

dust

Welding fume purifiers are installed, at the same time, reasonable installation of workshop fans, and ventilation fans in workshops to enhance ventilation

Welding fume purifiers are installed, and ventilation fans are installed in the workshop to enhance ventilation

2

Plate welding workshop

Polishing and derusting

dust

Adopt closed-type shot blasting derusting machine, the dust is collected and cleaned by cyclone dust collector and bag dust collector, and then discharged through a 15m exhaust tube at high altitude

The QXY3000 steel plate pretreatment line is adopted, and the dust is discharged from the 15m exhaust cylinder at high altitude after being purified by the LLT-30 filter cylinder dust collector

Spray paint

Benzene, toluene, xylene

After being collected by the air collection hood, it is treated with a water film dust collector, and then discharged through a 15m exhaust tube at high altitude

In actual production, manual spraying is changed to fully automatic sealing operation (QXY3000 steel plate pretreatment line), and the paint removal method adopts the "filter cartridge + activated carbon adsorption" method.

3

canteen

cooking

Fume

Oil fume purification system

Installed a range hood and led to the roof emission

2. Wastewater

The EIA report stated: equipment cooling water is recycled, oily sewage in the production workshop is pretreated with oil, domestic sewage is pretreated with oil and slag and septic tank, and all sewage is discharged into the sewage pipe network of the park. "Comprehensive Emission Standards" (GB8978-1996) three-level standard and the requirements of the quality standards of the sewage treatment plant in Shannan.

According to the actual survey on site, the cooling water of the equipment is recycled, and the production wastewater and domestic sewage are treated by the grease trap into the first-stage sewage treatment station for centralized treatment, and the treatment reaches the third level of the standard of Table 4 of the Comprehensive Wastewater Discharge Standard (GB8978-1996). The sewage pipe network entering the park enters the Shannan sewage treatment plant for further treatment.

3. Solid waste

The solid waste produced in the second phase of the project can be classified into hazardous waste and general waste according to its toxicological properties. General wastes are mainly waste scraps, scrap iron scraps, waste packaging and welding, dust collected in the grinding process, and domestic garbage. The hazardous wastes are mainly waste emulsion, waste paint residue, waste activated carbon, waste paint buckets and waste oil.

Waste scraps, iron scraps, waste packaging and dust collected during welding and grinding processes generated in the production process are collected and sold out; domestic waste is handed over to the sanitation department for regular transportation.

The waste emulsion is temporarily stored in a dedicated tank, and hazardous wastes such as waste paint residues, waste activated carbon, waste paint buckets, and waste oil are stored in the hazardous waste temporary storage warehouse and handed over to a hazardous waste disposal unit with corresponding treatment qualification for centralized treatment.

4. Noise

The main noise of the second phase of the project is the noise generated when the equipment such as shot blasting machine, air compressor, drilling machine, lathe, planer, shearing machine is in operation.

  List of main noise prevention measures of the second phase project

Workshop or plant

Main noise source

feature

Governance measures

Plate welding workshop

Shot peening

continuous

Install muffler on exhaust hole of air valve

Collision of metal parts

Sporadic

 

Welding sound

continuous

Use low noise equipment

Workshop overall noise

continuous

Workshop sound-absorbing material

Machine shop (the first joint workshop)

Grinding machine sawing machine drilling machine grinder

continuous

Use low noise equipment and shock absorber

Air compressor fan

continuous

Use low-noise equipment, shock absorbers, silencers

Collision of metal parts

Sporadic

 

Workshop overall noise

continuous

Workshop sound-absorbing material

3. Investigation, acceptance and monitoring results

1. Exhaust emission monitoring conclusion

The waste gas generated in the second phase of the project is mainly the dust generated by grinding and derusting and the benzene, toluene and xylene produced by spray painting.

Set up 4 monitoring points around the plant boundary, monitoring 2 days, 4 times a day. The monitoring results show that the dust at each monitoring point is lower than the standard limit in the second level standard of the new pollution source in the "Comprehensive Emission Standards for Air Pollutants" (GB16297-1996).

2. Wastewater discharge monitoring conclusion

The sewage generated by the second phase project is divided into production wastewater and domestic sewage. After being pretreated by the grease trap, the production wastewater and domestic sewage enter the first-stage sewage treatment station for centralized treatment, and then are discharged into the municipal municipal sewage pipe network and into the Shannan sewage treatment plant for treatment .

The monitoring results of wastewater show that the discharge concentration of PH, chemical oxygen demand, suspended solids, ammonia nitrogen, petroleum, and five-day biochemical oxygen demand in the total discharge of the wastewater all meet the third level of the Comprehensive Wastewater Discharge Standard (GB8978-1996) The requirements in the standard.

3. Conclusion of noise monitoring at plant boundary

Set up 4 monitoring points at the plant boundary and 1 monitoring point at each of the two sensitive points to monitor the equivalent continuous A sound level, once for each day and night for 2 days.

The monitoring results show that the daytime and nighttime sound level values ​​of each monitoring site of noise and noise at the plant boundary meet the requirements of Class 3 and Class 4 standards of "Environmental Noise Emission Standards for Industrial Enterprises at Plant Boundary" (GB12348-2008). The daytime and nighttime sound level values ​​of the noise at the two sensitive points are in compliance with the requirements of the Class 2 standard of "Environmental Noise Emission Standards for Industrial Enterprises' Boundaries" (GB12348-2008).

4. Conclusion of solid waste investigation

The solid waste of the project mainly includes hazardous waste and general waste. General wastes are mainly waste scraps, scrap iron scraps, waste packaging and welding, dust collected in the grinding process, and domestic garbage. The hazardous wastes are mainly waste emulsion, waste paint residue, waste activated carbon, waste paint buckets, etc.

Waste scraps, iron scraps, waste packaging and dust collected during welding and grinding processes generated in the production process are collected and sold out; domestic waste is handed over to the sanitation department for regular transportation.

The waste emulsion is temporarily stored in a dedicated tank, and hazardous wastes such as waste paint residues, waste activated carbon, waste paint barrels, and waste oil are stored in the hazardous waste temporary storage warehouse, and are handed over to Hubei Tianyin Hazardous Waste Concentration with appropriate disposal qualifications. Disposal Co., Ltd. and Huanggang Tianyi Environmental Protection Technology Co., Ltd. deal with it centrally.

5. Total control conclusion

The discharge amount of pollutants in the project wastewater is: chemical oxygen demand 0.25t/a, ammonia nitrogen 0.014t/a, which meets the requirements of the EIA total control index (COD≤8.035t/a, ammonia nitrogen≤0.203t/a).

The main pollutant discharge amount of the project is: 0.3t/a, xylene 0.024t/a, which meets the expected total control index requirements (total amount of benzene, xylene, toluene ≤1.4t/a, dust ≤1.11t/a ).

4. Problems in the project, as well as requirements and suggestions

1. Problems

(1) A large amount of waste oil exists in wastewater treatment facilities.

(2) Hazardous waste storage facilities are not standardized.

2. Requirements and suggestions

(1) Further strengthen the environmental management of environmental protection facilities and production processes, prevent "running, running, dripping, and leakage", prevent environmental accidents, improve the operating efficiency of environmental protection facilities, and ensure the long-term and stable discharge of pollutants.

(2) According to the requirements of "Technical Specifications for the Collection, Transportation and Transportation of Hazardous Wastes", the temporary storage points of the workshops and hazardous waste warehouses should be standardized to ensure the safety of the environment.

V. Rectification instructions (see Annex 2 "List of on-site inspection and acceptance opinions and rectification instructions")

6. Conclusion

The project has complete environmental protection procedures, basically implemented the environmental protection measures stipulated in the EIA and approval, and established a corresponding environmental protection management system. The "three wastes" emissions have reached the relevant national emission standards. At present, it meets the environmental protection acceptance requirements for completion.

Publicity period: December 12, 2017-January 12, 2018

Report phone: 0714-6398115

Public notice: "Self Acceptance Opinion" and "Acceptance Monitoring Report" are published on the company's website www.ysd-hd.com; "Self Acceptance Opinion" is also published in the company's public notice (company address 158 Jinshan Avenue, Economic Development Zone, Huangshi City) .

Attachment 1: Sign-in form of the on-site meeting of environmental protection acceptance inspection of the project completion

Appendix 2: List of on-site inspection and acceptance opinions and rectification instructions

  Hubei Sanhuan Forging Equipment Co., Ltd.

  December 12, 2017

  Appendix 2: List of on-site inspection and acceptance opinions and rectification instructions

Serial number

Problem summary

Corrective measures

Photo comparison before and after rectification

1

There is a lot of waste oil in the waste water collection basin of the waste water treatment facility.

Arrange salvage

 

(Photo before rectification)

 

(Photos under rectification)

(Photo after rectification)

2

At the entrance of the waste emulsion storage tank, there are no measures to prevent running and dripping.

The outer edge of the waste emulsion storage tank is surrounded by a 60mm high edge, and it is rainproofed.

 

(Photo before rectification)

(Photo after rectification)

Serial number

Problem summary

Corrective measures

Rectify photos

3

The solid waste in the production workshop is a standard temporary storage area without classification.

Welding, assembly, plus two, plus three of hazardous waste, and store waste paint buckets, paint residues, and waste oil in designated areas.

 

(Plate welding workshop)

 

(Assembly workshop)

 

(Plus second workshop)

 

(Plus three workshops)

Serial number

Problem summary

Corrective measures

Rectify photos

4

Hazardous waste management is not perfect, and there are no solid waste collection, storage, and processing accounts.

Improve the hazardous waste management system, stipulate the specific requirements for the collection, storage and treatment of hazardous waste, and establish a hazardous waste ledger.

 

 

Serial number

Problem summary

Corrective measures

Rectify photos

5

Hazardous waste centralized storage room, without leakage treatment.

All cement of the surrounding wall shall be leveled, and the lower part of the surrounding wall shall be 100mm, and the collection trench and collection well shall be treated to prevent leakage.

 

(Waterproof coating)

(Photo after rectification)

6

There are no waste oil collection measures in the iron filing room.

A collection ditch collection well is built in the iron filing room,

And do anti-leakage treatment.

 

(Photo after rectification)

               

 